Thursday, April 24, 2008

Vertical Forming Begins

Vertical forming is being set in place for the pouring of the retaining walls at the bulkhead for the first floor.
These workers are safely tied in to do the work at the top of this 18 ft retaining wall.
This will be a subterranean wall in the front corner of the ground or first floor of the main building.
A second wall will be hung on the other side and then concrete poured into the formed wall.

This photo is taken from the entrance driveway. The area that is being constructed is indicated in the center of the picture.

No comments: