Our rooms are beginning to be framed in. All the studs are steel.
They are about the size of a standard 2 X 4, but all steel with lock plate and screwed supports. This is a very sturdy construction method and will not rot, warp, or dry out like wood.
Fire alarm feeds are in place and sprinkler lines are being pulled to the rooms.
HVAC ducts are in place and the system design is revealed in area 3.
All line feeds are single wire and flow through conduits.
The artistry of this section of conduit bends is only out weighed by the difficulty of creating this precision section. Amazing.
Wednesday, October 1, 2008
An Early Peek into a Classroom
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment